To read this content please select one of the options below:

A Deterministic Maintenance‐scheduling Problem for a Group of Non‐identical Machines

Moncer Hariga (Industrial Engineering Programme, College of Engineering, King Saud University, Riyadh, Saudi Arabia)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 July 1994

386

Abstract

Addresses a deterministic maintenance‐scheduling problem for a group of non‐identical machines. The problem is formulated as a mixed integer non‐linear program which is approached heuristically. In the model formulation, it is assumed that a major overhaul brings the machine back to its new condition, whereas a minor overhaul restores it to a specified operating condition. An iterative solution procedure is developed to obtain a near‐optimal cyclic overhaul schedule. Presents a worked example to illustrate the proposed solution method.

Keywords

Citation

Hariga, M. (1994), "A Deterministic Maintenance‐scheduling Problem for a Group of Non‐identical Machines", International Journal of Operations & Production Management, Vol. 14 No. 7, pp. 27-36. https://doi.org/10.1108/01443579410062149

Publisher

:

MCB UP Ltd

Copyright © 1994, MCB UP Limited

Related articles