To read this content please select one of the options below:

A Microcomputer‐based Data Management and Capacity‐planning System

Sabah U. Randhawa (Oregon State University, USA)
Ramesh Pendakur (Oregon State University, USA)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 May 1990

194

Abstract

A microcomputer‐based information management and capacity planning system for discrete parts manufacturing is described. The two primary components of the system are: (1) framework for information management and schedule generation, and (2) heuristic methods for workload balancing. The databases facilitate streamlining and standardisation of the information used on the production floor. The schedules generated by the system help the user in developing machine level capacity plans. The automatic workload balancing heuristics provide an effective way to refine the initial schedules to balance the workload and to satisfy user specified constraints.

Keywords

Citation

Randhawa, S.U. and Pendakur, R. (1990), "A Microcomputer‐based Data Management and Capacity‐planning System", International Journal of Operations & Production Management, Vol. 10 No. 5, pp. 52-61. https://doi.org/10.1108/01443579010005146

Publisher

:

MCB UP Ltd

Copyright © 1990, MCB UP Limited

Related articles