To read this content please select one of the options below:

Critical factors of MRP implementation in small and medium‐sized firms

Alberto Petroni (Department of Industrial Engineering, University of Parma, Parma, Italy)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 March 2002

6506

Abstract

The paper deals with the implementation process of material requirements planning (MRP) within small and medium‐sized firms. While the literature shows almost general agreement on the critical factors of MRP implementation, few empirical studies exist to support the proposed elements. The purpose of this study is to identify the elements of MRP implementation that are required to ensure successful implementation. A number of elements of implementation were identified and subsequently grouped into a hierarchical structure consisting of eight broader elements. Criteria were selected as measures of the level of implementation success. The analysis revealed that only a few of the identified elements were indeed required for successful implementation. Among these are management support, level of functional integration and data accuracy.

Keywords

Citation

Petroni, A. (2002), "Critical factors of MRP implementation in small and medium‐sized firms", International Journal of Operations & Production Management, Vol. 22 No. 3, pp. 329-348. https://doi.org/10.1108/01443570210417623

Publisher

:

MCB UP Ltd

Copyright © 2002, MCB UP Limited

Related articles