To read this content please select one of the options below:

Approaches for commissioning time reduction

Rolf Bernhardt (Director for Robotics Research at Fraunhofer‐Institute Production Systems and Design Technology (IPK‐Berlin), Berlin, Germany. Tel: +49 3039006 156. Fax: +49 30 391 1037)

Industrial Robot

ISSN: 0143-991x

Article publication date: 1 February 1997

400

Abstract

States that manufacturing lines cannot be used for production during commissioning and that it is therefore always the goal to reduce the necessary efforts to a maximum extent. Starts with a description of the state‐of‐the‐art in this field based on the situation in the automotive industry. Additionally lists RTD fields to overcome these problems. Goes on to present methods and software tools aiming at a tremendous decrease in efforts required today.

Keywords

Citation

Bernhardt, R. (1997), "Approaches for commissioning time reduction", Industrial Robot, Vol. 24 No. 1, pp. 62-71. https://doi.org/10.1108/01439919710162719

Publisher

:

MCB UP Ltd

Copyright © 1997, MCB UP Limited

Related articles