TY - JOUR AB - A robot’s standard cycle time tends to be a primary criterion in estimating work cell through‐put. Many other factors, like robot placement, peripherals and optimization of the work envelope often are overlooked in the analysis. This paper provides insights into optimizing performance by considering all available options to improve cell VL - 27 IS - 5 SN - 0143-991X DO - 10.1108/01439910010372974 UR - https://doi.org/10.1108/01439910010372974 AU - Mahr Carl PY - 2000 Y1 - 2000/01/01 TI - Beyond the standard cycle: increasing total work cell productivity by optimizing robot placement and other key performance influencers T2 - Industrial Robot: An International Journal PB - MCB UP Ltd SP - 334 EP - 337 Y2 - 2024/04/25 ER -