Search results

1 – 2 of 2
Article
Publication date: 7 January 2019

Marcello Braglia, Roberto Gabbrielli and Leonardo Marrazzini

The purpose of this paper is to propose a new Lean metric named Overall Task Effectiveness (OTE), which can help analyst to define target task times and to identify the hidden…

Abstract

Purpose

The purpose of this paper is to propose a new Lean metric named Overall Task Effectiveness (OTE), which can help analyst to define target task times and to identify the hidden losses that account for most of the recorded time of manual assembly activities.

Design/methodology/approach

An alternative classification structure of the losses is developed to divide them in two classes. In the first one the losses that are external to the project order are included, and in the other one those due to inefficiencies directly ascribable to the project order are considered. Starting from this classification structure of the losses, a novel Lean metric, inspired from the well-known Overall Equipment Effectiveness (OEE), is developed to evaluate the effectiveness of a manual assembly task. A case study, which briefly explains the methodology and illustrates the capability of the corresponding metric, is provided.

Findings

This tool can be considered a suitable method to achieve simultaneously a dual purpose to establish time standards and to identify the hidden losses that account for most of the recorded time of manual assembly activities, estimating the impacts of potential corrective actions in terms of both efficiency and effectiveness.

Practical implications

OTE provides practitioners with an operative tool useful to highlight the points where the major inefficiencies take place in industries producing large complex items via manual assembly lines. Its practical application is demonstrated using a case study concerning a manufacturer of train wagons.

Originality/value

One distinctive, and contemporarily appealing, feature of OTE with respect to other analogous KPIs is that it provides a breakdown structure for process losses that simplifies the task of evaluating the current performances and, at the same time, individuates both the source of losses and the corresponding corrective actions.

Details

International Journal of Productivity and Performance Management, vol. 68 no. 2
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 15 January 2024

Marcello Braglia, Francesco Di Paco, Roberto Gabbrielli and Leonardo Marrazzini

This paper presents a new and well-structured framework that aims to assess the current environmental impact from a Greenhouse Gas (GHG) emissions perspective. This tool includes…

798

Abstract

Purpose

This paper presents a new and well-structured framework that aims to assess the current environmental impact from a Greenhouse Gas (GHG) emissions perspective. This tool includes a new set of Lean Key Performance Indicators (KPIs), which translates the well-known logic of Overall Equipment Effectiveness in the field of GHG emissions, that can progressively detect industrial losses that cause GHG emissions and support decision-making for implementing improvements.

Design/methodology/approach

The new metrics are presented with reference to two different perspectives: (1) to highlight the deviation of the current value of emissions from the target; (2) to adopt a diagnostic orientation not only to provide an assessment of current performance but also to search for the main causes of inefficiencies and to direct improvement implementations.

Findings

The proposed framework was applied to a major company operating in the plywood production sector. It identified emission-related losses at each stage of the production process, providing an overall performance evaluation of 53.1%. The industrial application shows how the indicators work in practice, and the framework as a whole, to assess GHG emissions related to industrial losses and to proper address improvement actions.

Originality/value

This paper scrutinizes a new set of Lean KPIs to assess the industrial losses causing GHG emissions and identifies some significant drawbacks. Then it proposes a new structure of losses and KPIs that not only quantify efficiency but also allow to identify viable countermeasures.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

1 – 2 of 2