Search results
1 – 2 of 2Onaopepo Adeniyi, Niraj Thurairajah and Feyisetan Leo-Olagbaye
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction…
Abstract
Purpose
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.
Design/methodology/approach
The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.
Findings
Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.
Research limitations/implications
This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.
Practical implications
The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.
Originality/value
The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.
Details
Keywords
Lichini Nikesha Weerasinghe, Akila Pramodh Rathnasinghe, Himal Suranga Jayasena, Niraj Thurairajah and Menaha Thayaparan
Building information modelling (BIM) claims to be spearheading the modern technological revolution in the global construction industry. While scholars have emphasised the…
Abstract
Purpose
Building information modelling (BIM) claims to be spearheading the modern technological revolution in the global construction industry. While scholars have emphasised the cruciality of BIM, associated costs have been identified as one of the major barriers to successful BIM implementation, as is the case in Sri Lanka. Besides, lean principles (LPs) are known for increasing efficiency, quality and eliminating waste, thereby reducing overall costs. Hence, this research aims at addressing the BIM implementation barrier associated with costs by applying suitable LP, enhancing overall value by minimising value-insignificant activities.
Design/methodology/approach
The study adopted a qualitative research approach. 10 experts with expertise in both BIM and LP were targeted for the primary data collection through semi-structured interviews. The collected data were analysed using manual content analysis.
Findings
Research findings discovered the cost centres that can be applied to the LPs and the effective LPs that can be applied with the cost centres of BIM implementation. The theoretical implication of the study is to provide insights into a potential application of LP for BIM cost centres, whereas practical consequences include the identification of LP's potential to minimise BIM cost centres, ergo, achieving a successful BIM implementation.
Originality/value
This study will be the first of its kind in the Sri Lankan construction industry, intending to apply LP with BIM implementation cost centres to achieve a successful implementation. This research also has paved the way forward for further research on the application of both the BIM and LP concepts for similar construction industries in developing countries across the world and in addressing other BIM implementation barriers.
Details