Search results

1 – 10 of 232
Open Access
Article
Publication date: 23 January 2024

Luís Jacques de Sousa, João Poças Martins, Luís Sanhudo and João Santos Baptista

This study aims to review recent advances towards the implementation of ANN and NLP applications during the budgeting phase of the construction process. During this phase…

Abstract

Purpose

This study aims to review recent advances towards the implementation of ANN and NLP applications during the budgeting phase of the construction process. During this phase, construction companies must assess the scope of each task and map the client’s expectations to an internal database of tasks, resources and costs. Quantity surveyors carry out this assessment manually with little to no computer aid, within very austere time constraints, even though these results determine the company’s bid quality and are contractually binding.

Design/methodology/approach

This paper seeks to compile applications of machine learning (ML) and natural language processing in the architectural engineering and construction sector to find which methodologies can assist this assessment. The paper carries out a systematic literature review, following the preferred reporting items for systematic reviews and meta-analyses guidelines, to survey the main scientific contributions within the topic of text classification (TC) for budgeting in construction.

Findings

This work concludes that it is necessary to develop data sets that represent the variety of tasks in construction, achieve higher accuracy algorithms, widen the scope of their application and reduce the need for expert validation of the results. Although full automation is not within reach in the short term, TC algorithms can provide helpful support tools.

Originality/value

Given the increasing interest in ML for construction and recent developments, the findings disclosed in this paper contribute to the body of knowledge, provide a more automated perspective on budgeting in construction and break ground for further implementation of text-based ML in budgeting for construction.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 25 March 2024

Roope Nyqvist, Antti Peltokorpi and Olli Seppänen

The objective of this research is to investigate the capabilities of the ChatGPT GPT-4 model, a form of artificial intelligence (AI), in comparison to human experts in the context…

2269

Abstract

Purpose

The objective of this research is to investigate the capabilities of the ChatGPT GPT-4 model, a form of artificial intelligence (AI), in comparison to human experts in the context of construction project risk management.

Design/methodology/approach

Employing a mixed-methods approach, the study draws a qualitative and quantitative comparison between 16 human risk management experts from Finnish construction companies and the ChatGPT AI model utilizing anonymous peer reviews. It focuses primarily on the areas of risk identification, analysis, and control.

Findings

ChatGPT has demonstrated a superior ability to generate comprehensive risk management plans, with its quantitative scores significantly surpassing the human average. Nonetheless, the AI model's strategies are found to lack practicality and specificity, areas where human expertise excels.

Originality/value

This study marks a significant advancement in construction project risk management research by conducting a pioneering blind-review study that assesses the capabilities of the advanced AI model, GPT-4, against those of human experts. Emphasizing the evolution from earlier GPT models, this research not only underscores the innovative application of ChatGPT-4 but also the critical role of anonymized peer evaluations in enhancing the objectivity of findings. It illuminates the synergistic potential of AI and human expertise, advocating for a collaborative model where AI serves as an augmentative tool, thereby optimizing human performance in identifying and managing risks.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 12 January 2024

Ernesto Cardamone, Gaetano Miceli and Maria Antonietta Raimondo

This paper investigates how two characteristics of language, abstractness vs concreteness and narrativity, influence user engagement in communication exercises on innovation…

Abstract

Purpose

This paper investigates how two characteristics of language, abstractness vs concreteness and narrativity, influence user engagement in communication exercises on innovation targeted to the general audience. The proposed conceptual model suggests that innovation fits well with more abstract language because of the association of innovation with imagination and distal construal. Moreover, communication of innovation may benefit from greater adherence to the narrativity arc, that is, early staging, increasing plot progression and climax optimal point. These effects are moderated by content variety and emotional tone, respectively.

Design/methodology/approach

Based on a Latent Dirichlet allocation (LDA) application on a sample of 3225 TED Talks transcripts, the authors identify 287 TED Talks on innovation, and then applied econometric analyses to test the hypotheses on the effects of abstractness vs concreteness and narrativity on engagement, and on the moderation effects of content variety and emotional tone.

Findings

The authors found that abstractness (vs concreteness) and narrativity have positive effects on engagement. These two effects are stronger with higher content variety and more positive emotional tone, respectively.

Research limitations/implications

This paper extends the literature on communication of innovation, linguistics and text analysis by evaluating the roles of abstractness vs concreteness and narrativity in shaping appreciation of innovation.

Originality/value

This paper reports conceptual and empirical analyses on innovation dissemination through a popular medium – TED Talks – and applies modern text analysis algorithms to test hypotheses on the effects of two pivotal dimensions of language on user engagement.

Details

European Journal of Innovation Management, vol. 27 no. 9
Type: Research Article
ISSN: 1460-1060

Keywords

Article
Publication date: 11 January 2023

Ibrahim Yahaya Wuni and Khwaja Mateen Mazher

Modular integrated construction (MiC) is a modern construction method innovating and reinventing the traditional site-based construction method. As it integrates advanced…

Abstract

Purpose

Modular integrated construction (MiC) is a modern construction method innovating and reinventing the traditional site-based construction method. As it integrates advanced manufacturing principles and requires offsite production of volumetric building components, several factors and conditions must converge to make the MiC method suitable and efficient for building projects in each context. This paper aims to present a knowledge-based decision support system (KB-DSS) for assessing a project’s suitability for the MiC method.

Design/methodology/approach

The KB-DSS uses 21 significant suitability decision-making factors identified through literature review, consultation of experts and questionnaire surveys. It has a knowledge base, a DSS and a user interface. The knowledge base comprises IF-THEN production rules to compute the MiC suitability score with the efficient use of the powerful reasoning and explanation capabilities of DSS.

Findings

The tool receives the inputs of a decision-maker, computes the MiC suitability score for a given project and generates recommendations based on the score. Three real-world projects in Hong Kong are used to demonstrate the applicability of the tool for solving the MiC suitability assessment problem.

Originality/value

This study established the complex and competing significant conditions and factors determining the suitability of the MiC method for construction projects. It developed a unique tool combining the capabilities of expert systems and decision support system to address the complex problem of assessing the suitability of the MiC method for construction projects in a high-density metropolis.

Article
Publication date: 3 November 2021

Ayodeji Emmanuel Oke, Ahmed Farouk Kineber, Ibraheem Albukhari and Adeyemi James Dada

The purpose of this paper is to evaluate the barriers militating against the adoption of robotics in the construction industry.

Abstract

Purpose

The purpose of this paper is to evaluate the barriers militating against the adoption of robotics in the construction industry.

Design/methodology/approach

Robotics implementation barriers were obtained from the previous studies and then through questionnaire survey construction stakeholders in Nigeria evaluate these barriers. Consequently, these barriers were examined via the exploratory factor analysis (EFA) technique. Furthermore, a model of these barriers was implemented by means of a partial least square structural equation modeling (PLS-SEM).

Findings

The EFA results showed that these barriers could be categorized into two: cost and technology. Results obtained from the proposed model showed that platform tools were crucial tools for implementing cloud computing.

Originality/value

The novelty of this research work will be provided a solid foundation for critically assessing and appreciating the different barriers affecting the adoption of robotics.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 3
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 23 January 2023

Bruno Falcón Silveira and Dayana Bastos Costa

Several studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for…

Abstract

Purpose

Several studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for generating 4D models and their integrated use with Location-Based Planning and the Last Planner® System is not well discussed. Therefore, this paper aims to develop a method for automating the generation and use of 4D BIM models integrated with Location-Based Planning and Last Planner® System supporting project control cycles.

Design/methodology/approach

The research strategy adopted was Design Science Research. The automated method for using the 4D models was developed and refined in two residential building projects in Brazil, along with 31 meetings and involving 11 direct users. The assessment of the proposed method focuses on four constructs: the impact of process automation, the impact on the identification and assessment of site progress and the planning process, ease of adoption and utility of the proposed method.

Findings

The results of this paper indicated increased adherence between planned and executed through an automated method for using the 4D models. The established routines enabled automating the link between the planning levels and the three-dimensional (3D) model, providing a more agile and updated data source and achieving 92.8% of user satisfaction regarding the deadline and frequency of delivery of the 4D model reports. Moreover, this study identified the relationships between the processes of the method proposed and Digital Models.

Originality/value

The primary scientific value achieved in this study is creating a method for automating processes and simplifying steps for the generation and use of 4D BIM models in the production planning and control cycles during the construction phase.

Details

Construction Innovation , vol. 24 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 12 September 2023

Pramod Malaka Silva, Niluka Domingo and Noushad Ali Naseem Ameer Ali

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous…

Abstract

Purpose

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous dispute that costs the project success and good relationships and affects stakeholders' expectations. There has been a focus on causes of construction-related disputes, and studies over the past three decades have attempted to identify a more comprehensive list of reasons for disputes. Some of these studies' limitations were geographical, project delivery methods and project types. The purpose of this study is to identify the most recent and conclusive list of causes of disputes based on current literature by undertaking a systematic literature review (SLR).

Design/methodology/approach

Considering the large number of studies that focused on causes of disputes, this study aims to develop a comprehensive list of causes, using a SLR, as it ensures that all previous articles in multiple databases are reviewed to produce a comprehensive outcome. A six-stage SLR was followed from background study to analysis and reporting.

Findings

Not surprisingly, the number of publications has increased over time, most from the Middle East region. The interconnected nature of the causes was widely emphasised. The SLR has produced eight common core causes of disputes. They are: poor contractual arrangements, employer-initiated scope changes, unforeseen site changes, poor contract understanding and administration, contractor’s quality of works, the inability of the contractor to achieve time targets, non- or delayed payments and poor quality of design. The majority of previous authors realised that disputes could be avoided by parties’ involvement during the early stages, avoiding being opportunistic and acting collaboratively.

Originality/value

Even though numerous studies have been carried out to identify the causes of disputes in the construction industry, none did a SLR. This study aggregates all the previous studies that focused on construction-related disputes systematically. Categorising causes based on the party primarily responsible help various stakeholders by providing a distinct list of factors to avoid that contribute to disputes.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 12 December 2023

Judith Fauth, Tanya Bloch and Lucio Soibelman

Building permitting is mostly a manual, labor intensive and time-consuming process. Initiatives for streamlining the process are not always helpful since they often fail to…

Abstract

Purpose

Building permitting is mostly a manual, labor intensive and time-consuming process. Initiatives for streamlining the process are not always helpful since they often fail to address the core problems within the process. A framework for modeling the permitting process can be useful to identify bottlenecks, core challenges and best practices. Hence, the authors aim to demonstrate and validate a previously suggested workflow for permit process modeling using the permitting process in Israel as a test case.

Design/methodology/approach

The authors implement qualitative expert interviews for data acquisition. The collected data are then processed for a qualitative data analysis. The results of the analysis are then validated using a focus group workshop in the field of building permits. In the test case the focus group consisted of Israeli experts.

Findings

The authors present a detailed overview of the as-is building permit process in Israel and the existing challenges. Through this test case, the authors found that the framework is applicable in different countries and that it can provide valuable insights into the core problems within the process. In addition, application of the same framework in different countries can provide comparable results that would allow the authors to identify best practices.

Originality/value

The major contribution of this work is the development and validation of a framework for building permitting process modeling which can be used to identify existing challenges and bottlenecks in the process. Implementing a structured and unified approach provides an opportunity to easily compare processes in different countries to identify best practices.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 March 2023

Kaiyang Wang, Fangyu Guo, Ruijia Zhou and Liang Qian

In recent years, augmented reality (AR) has shown its potential to assist various construction activities. Its use commonly requires additional refinement to be integrated into…

Abstract

Purpose

In recent years, augmented reality (AR) has shown its potential to assist various construction activities. Its use commonly requires additional refinement to be integrated into the building information modeling (BIM) process. Nevertheless, few studies have investigated AR implementation in BIM-enabled projects because of numerous challenges related to its implementation. This study aims to investigate the implementation of AR in construction and identify the critical mechanisms for implementing BIM-AR successfully.

Design/methodology/approach

A mixed methodology was adopted for this study. First, this work presents a bibliometric analysis covering articles obtained from Scopus database published between 2000 and 2022. A sample size of 65 research papers pertinent to AR in construction was analyzed using VOSviewer software. Second, a participatory case study was conducted for a BIM-enabled project in China to gain insight into how BIM-AR implementation in construction is achieved.

Findings

The findings from the bibliometric analysis show an increasing interest in AR research within construction. The results indicate that AR research focuses on four clusters: real-time communication, project management, construction activities and education. Findings from the case study provide an empirical experience of AR application scenarios in a BIM-enabled project. Concomitantly, 15 critical success factors that influence BIM-AR implementation were finally identified and demonstrated.

Originality/value

This study provides a rich insight into the understanding and awareness of implementing AR. First, the findings are beneficial to construction practitioners and researchers because they provide a concentrated perspective of AR for emerging activities in the construction industry. Second, the results obtained from the case study could provide a useful guide for effectively implementing AR in a BIM-enabled construction project. Overall, this study may stimulate further research on AR-related studies in construction, such as BIM integration, factor analysis and construction education.

Details

Construction Innovation , vol. 24 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 December 2023

Baburhan Uzum, Bedrettin Yazan, Sedat Akayoglu and Ufuk Keles

This study aims to examine how teacher candidates (TCs) in Türkiye and the USA navigate their intercultural communication skills in a telecollaboration project.

Abstract

Purpose

This study aims to examine how teacher candidates (TCs) in Türkiye and the USA navigate their intercultural communication skills in a telecollaboration project.

Design/methodology/approach

Forty-eight TCs participated (26 in Türkiye and 22 in the USA) in the study. TCs discussed critical issues in multicultural education on an online learning platform for six weeks. Their discussions were analyzed using content and discourse analysis.

Findings

The findings indicated that TCs approached the telecollaborative space as a translingual contact zone and positioned themselves and their interlocutors in the discourse by using the personal pronouns; I, we, you and they. When they positioned themselves using we (people in Türkiye/USA), they spoke on behalf of everyone included in the scope of we. Their interlocutors responded to these positionings either by accepting this positioning and responding with a parallel positioning or by engaging in translingual negotiation strategies to revise the scope of we and sharing some differences/nuances in beliefs and practices in their community.

Research limitations/implications

When TCs talk about their culture and community in a singular manner using we, they frame them as the same across every member in that community. When they ask questions to each other using you, the framing of the questions prime the respondents to sometimes relay their own specific experiences as the norm or consider experiences from different points of view through translingual negotiation strategies. A singular approach to culture(s) may affect the marginalized communities the most because they are lost in this representation, and their experiences and voices are not integrated in the narratives or integrated with stereotypical representation.

Practical implications

Teachers and teacher educators should first pay attention to their language choices, especially use of pronouns, which may communicate inclusion or exclusion in intercultural conversations. Next, they should prepare their students to adopt and practice language choices that communicate respect for cultural diversity and are inclusive of marginalized populations.

Social implications

Speakers’ pronoun use includes identity construction in discourse by drawing borders around and between communities and cultures with generalization and particularity, and by patrolling those borders to decide who is included and excluded. As a response, interlocutors use pronouns either to acknowledge those borders and respond with corresponding ones from their own context or negotiate alternative representations or further investigate for particularity or complexity. In short, pronouns could lead the direction of intercultural conversations toward criticality and complexity or otherwise, and might be reasons where there are breakdowns in communication or to fix those breakdowns.

Originality/value

This study shows that translingual negotiation strategies have explanatory power to examine how speakers from different language backgrounds negotiate second and third order positionings in the telecollaborative space.

Details

Journal for Multicultural Education, vol. 18 no. 1/2
Type: Research Article
ISSN: 2053-535X

Keywords

1 – 10 of 232